Description
of Work: TIC
used a Safespan floor system, the first in Missouri, to gain safe, quick
and easy access to tall structures while containing 100% of the blasting
waste.
The Challenge: Conveyor
belts and steel structures 120 ft. high made access impossible with
man-lifts and catenary systems, and too expensive for containment with
cable/outrigger systems.
TIC used the Safespan floor systems as a smart, unique solution.
Location: Labadie,
MO
Square Footage: 200,000
Containment: SSPC
Class 1
|