Description
of Work: The
projects required lead abatement, painting and challenging adaptations to
specifications of the dam. Containment was designed and erected to protect
workers and the environment from lead exposure.
The Challenge: The
containment system had to be modified to accommodate steel bridge girders
added to the specification.
A massive wildfire al shut down the only access roads to the job,
but TIC adapted to the challenges and finished the job with no lost time
accidents.
Coating System: SSPC-5
white metal blast and a moisture cured urethane system
|