Case History

Project:
Complete Lead Abatement and Coating of Four Tainter Gates on a Dam

Project Owner:

Description of Work:
The projects required lead abatement, painting and challenging adaptations to specifications of the dam. Containment was designed and erected to protect workers and the environment from lead exposure.

The Challenge:
The containment system had to be modified to accommodate steel bridge girders added to the specification.  A massive wildfire al shut down the only access roads to the job, but TIC adapted to the challenges and finished the job with no lost time accidents.

Coating System:
SSPC-5 white metal blast and a moisture cured urethane system